ServiceLNG/Hydro Power Equipment

Contributing to thermal power plant construction by providing unified services for everything from transportation to installation work.

The demand for energy is rapidly rising within Japan in order to serve a digital society, such as for the rapid rise of generative AI. Furthermore, with the expansion of renewable energy aimed at achieving carbon neutrality, the role played by LNG generators is gaining in importance as a gap power supply to ensure grid stability.
We offer integrated services for your internationally- or domestically-sourced outsize equipment, from marine shipping to transportation from the port, as well as installation work.

Properties

1. Precisely planned stevedoring and transportation work

We provide plans to select a port where the outsize equipment will off-load from the vessel, plans for setting a heavy duty crane at the wharf after selecting the port, obtain requisite permits for general road use, and deliberate on terrestrial routes to construction sites from the port. We also transport everything safely and reliably in accordance with these plans and your construction process.

off-load
transportation
construction

2. Reliable deliveries using a variety of specialized tools and equipment

We handle the installation of power generator equipment we transport to turbine housings and getting them onto base structures. However, the size and weight of the turbines, as well as the height and orientation of their installation, may vary from power station to power station.
We use a combination of systems including power-jack systems most prominently, as well as sliding systems, staging jacks, and turntables, all of which are company-owned. This lets us find an optimal approach even under difficult conditions, ensuring safe, reliable installation with our proprietary technologies.

the installation of power generator equipment
the installation of power generator equipment
the installation of power generator equipment

3. One-stop engineering services all the way up to turbine installation

We adjust positioning carefully while assembling turbines and generators after getting them onto the bases.
We address the needs of our customers by providing not only transport, delivery, and the loading of equipment onto bases, we also installation work.

positioning the turbines
positioning the turbines

Example Equipment Usage

Power Jack System (Hydraulic Lifter)
Power Jack System (Hydraulic Lifter)
The Power Jack System (Hydraulic Lifter) moves horizontally with a drive function and also ascends using hydraulic jacks. It is primarily used to unload heavy equipment or for the installation of equipment. Its maximum capacity is 600 tons/device.
Power Jack System (Upper Section)
Power Jack System (Upper Section)
Staging Jack (Lower Section) (Large Hydraulic Unit Jack)
The above items are for raising and lowering heavy equipment, and truly shine in deliveries to elevated locations or bridge construction.
Designed to withstand earthquake loads and with horizontal forces during work in mind, it also comes with a synchronization feature for use of multiple units simultaneously.

Cases of Hydro Power Equipment